beta
/Acid Impacts On A Leach Stockpile
Abstract

The system may include a secondary irrigation feature that determines a percent of overlap of each of a plurality of submodules in a second lift over each of a plurality of submodules in a first lift and adjusts at least one of leaching operations or a leaching model based on the total tonnage weighted average of metal in the second lift. The method may further comprise determining an acid gap based on a difference between total acid given and total acid consumption; and further adjusting at least one of the leaching operations or the leaching model based on the acid gap. The method may further comprise determining a percentage of compacted material based on the material that is compacted and irrigated divided by the material that is irrigated; and further adjusting at least one of the leaching operations or the leaching model based on the percentage of compacted material.

Full Text

What is claimed is:

The system may include a secondary irrigation feature that determines a percent of overlap of each of a plurality of submodules in a second lift over each of a plurality of submodules in a first lift and adjusts at least one of leaching operations or a leaching model based on the total tonnage weighted average of metal in the second lift. The method may further comprise determining an acid gap based on a difference between total acid given and total acid consumption; and further adjusting at least one of the leaching operations or the leaching model based on the acid gap. The method may further comprise determining a percentage of compacted material based on the material that is compacted and irrigated divided by the material that is irrigated; and further adjusting at least one of the leaching operations or the leaching model based on the percentage of compacted material.
Timeline
Filed
02/18/2026
Published
06/25/2026
Granted
Not Available
IPC Codes(5)
G06Q 10/04:Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q 30/0202)
C22B 3/06:in inorganic acid solutions
C22B 15/00:Obtaining copper