beta
/Resource Management System And Additive Manufacturing Facility With Such
Abstract

A resource management system (39) manages a supply of resource material and/or resource items to a plurality of at least two additive manufacturing machines (3) for additive manufacturing. The resource management system (39) includes a control unit (41) that is configured to receive a signal indicative of a demand for resource material and/or resource items of any of the additive manufacturing machines (3). The control unit (41) is configured to schedule the supply of demanded resource material and/or resource items according to a predetermined prioritization scheme for resolving demand conflicts.

Full Text

What is claimed is:

A resource management system (39) manages a supply of resource material and/or resource items to a plurality of at least two additive manufacturing machines (3) for additive manufacturing. The resource management system (39) includes a control unit (41) that is configured to receive a signal indicative of a demand for resource material and/or resource items of any of the additive manufacturing machines (3). The control unit (41) is configured to schedule the supply of demanded resource material and/or resource items according to a predetermined prioritization scheme for resolving demand conflicts.
Timeline
Filed
03/05/2026
Published
07/09/2026
Granted
Not Available
IPC Codes(7)
G05B 19/418:Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
B29C 64/153:using layers of powder being selectively joined, e.g. by selective laser sintering or melting
B29C 64/357:Recycling