A process cycle time determination method includes: performing processing to obtain a first dataset based on production process data and attribute data of a line body of a production line; performing two-dimensional matrix conversion on the first dataset to obtain a first matrix when there is a missing value in the first dataset; performing filling on the missing value in the first matrix by using the K-nearest neighbors model and the chain equation model of random forest to obtain a corresponding filling value; filling the filling value in the position of the corresponding missing value in the first dataset to obtain a second dataset; and determining a process cycle time of the target station of the target line body in the production process of the target vehicle type based on the second dataset.
Full Text
What is claimed is: